The Company announced a JORC (2012) Mineral Resource of 1.83 million tonnes at 1.74% Cu for 31,800 tonnes of contained copper at a cut-off grade of 0.8% Cu in June 2023(1)
Canbelego Main Lode Mineral Resource Estimate
(1) For full details, please refer to the Helix ASX Announcement dated 14 June 2023
Homeville Mineral Resource Estimate
A JORC (2012) Mineral Resource of 17.86 million tonnes at 0.89% Ni and 0.06% Co at a cut-off grade of 0.7% Ni was reported in September 2018(2)
(2) For full details refer to ASX Report 28 September 2018 from Alpha HPA, formerly Collerina Cobalt Ltd.
Gold Basin Oxide-Gold Project
Arizona, USA
JORC (2012) Inferred Resource: 8.35 Mt @ 1.12 g/t Au for 299,800 oz Au
Status | Estimate first reported 2019, prior to Helix’s entry into the project. Since then, 335 additional drillholes (35,157 m) have been completed but are not yet included in the current Mineral Resource Estimate.
Notes | Resource update planned. The Gold Basin deposits contain near-surface oxide gold mineralisation extending to ~150 m depth and are considered amenable to open-pit mining and heap leach processing.
Gold Basin Oxide-Gold Project (May 2025)
Figure 1. Gold Basin Oxide-Gold Project (May 2025)







